How it works

You have four moments. We handle the rest.

Send the brief, review staging, verify handover, and answer an async ticket if needed. Between those moments, a named engineer scopes, builds, tests, and deploys to your cloud.

Interactive walkthrough

The night shift machine

Six gated stages, one continuous line. Move through the stages or play the whole cycle.

Input · document

A brief the studio can act on

  • The problem and the target user
  • Core features and the first launch boundary
  • References, examples, or existing assets
Read details for this stage
  • No specification is required. A clear problem statement is enough to start.
  • The studio replies with questions only when a missing detail blocks scoping.
  • Micro and Complex apps use the same intake; the difference is the size of the first launch.

Stage 1 of 6: Brief & Intake

Your side of the table

Four moments. Everything else is ours.

Select a moment to see what the studio is doing behind it.

Start your app

While you do that

The studio handles:

  • Triage the brief and check whether it is complete enough to scope.
  • Classify the first launch as a Micro or Complex app.
  • Ask only the questions that block a written scope.

No standups. No backlog grooming. No chasing engineers. Just one clear next action when the studio needs you.

SLA, without mystery

The clock runs while we work. It pauses when the next move is yours.

Micro apps run 3–6 days. Complex apps run 7–14 days. The clock measures studio execution, not time spent waiting for your review.

Read the SLA policy

The clock you can audit

It runs while we work. It pauses when the next move is yours.

The SLA measures studio execution, not time spent waiting for a decision. Pick a pause reason to see what happens to the clock and what the client needs to do.

Clock running. The studio is executing the sprint.

Example only. Your scope sheet defines the actual window.

What you actually get

Proof at every gate.

Three artifacts make the process auditable: the scope, the QA record, and the handover manifest.

Readiness gate · signed before build

A written scope, locked before code

Acceptance criteria, data model, launch boundary, and an explicit out-of-scope list. The studio can be held to it.

  • Acceptance criteria for the first launch
  • A named engineer and a named reviewer
  • Out-of-scope work priced separately

Realistic schedules

You sleep. The work moves.

Two example schedules. The clock pauses when the next move is yours, so the date reflects studio execution rather than waiting time.

Day 0 16:00
Send brief (15–20 min)
Triage and draft the written scope
Brief complete
Day 1 10:00
—
Lock scope, assign engineer, start build
Readiness Gate passed
Day 2 14:00
—
Build core functionality and automated tests
In build
Day 3 11:00
Review staging (20–30 min)
Run E2E QA and deploy the staging preview SLA pauses while you review
Staging approved
Day 4 15:00
—
Close in-scope revisions and run final regression
QA verification pass
Day 5 10:00
Verify handover (10–15 min)
Deploy to your cloud and transfer the repository
Handover verified

Example schedules. Actual dates depend on scope clarity, third-party access, and how quickly the next decision is available.

The night shift

You sleep. The work moves.

One illustrative Micro night, from brief to verified handover. Estimate your own window with the same SLA ranges the studio commits to.

Night shift log

One Micro night, brief to handover

Illustrative
  1. 21:10 Brief received Brief card Your move
  2. 21:45 Scope drafted Written scope Studio
  3. 23:10 Scope locked · clock starts Readiness gate Studio
  4. 01:30 Build in progress Commit stream Studio
  5. 04:20 QA gate passed Test checklist Studio
  6. 06:10 Staging deployed Preview URL Studio
  7. 07:40 Review approved Signed-off staging Your move
  8. 09:00 Handover verified Manifest Studio

Example timings for one Micro cycle. Actual dates depend on scope, feedback, and third-party access. The SLA clock pauses while the next move is yours.

Estimate the window

Pick a start date. See the range.

App type

Estimated launch window

Choose a start date

Select a date to see the estimated window.

Build · 55%QA · 15%Staging · 15%Handover · 15%
Start with this timeline

Micro 3–6 days · Complex 7–14 days. Estimates, not a contract. The clock pauses while the next move is yours.

Read the full six-stage process Stage, your action, studio action, gate, SLA behavior
StageWhat you doWhat the studio doesQuality gateSLA behavior
01 Brief & IntakeSend the problem, the people who will use it, the core features, and any reference you already have.The studio triages the idea, classifies it as a Micro or Complex app, and checks whether the brief is complete enough to scope.Brief receivedTimer pending start
02 Scope Lock & ReadinessAnswer a short clarification if the studio asks. After the scope is locked, changes are handled as a separate decision.Write the specification, acceptance criteria, data model, and out-of-scope list. Assign a named engineer and start the SLA clock.Written scope lockedClock starts
03 Night Shift BuildNothing. Track progress in the client dashboard and answer an async ticket only if the engineer needs a decision.The named engineer builds the product: interfaces, data model, API, integrations, and automated tests. Commits and progress appear in your dashboard.Build completeClock running
04 Internal QA GateNothing. The studio does not ask you to test an unfinished build.Run type checks, unit and end-to-end tests, security checks, and responsive checks. Open blocker bugs stop the release.QA pass · zero blockersClock running
05 Staging ReviewOpen the live staging URL, test the critical paths, and approve or request an in-scope revision.Deploy the staging build, provide test credentials, publish release notes, and pause the SLA clock while you review.Staging approvedClock paused · waiting on you
06 Cloud Handover & VerificationVerify the repository, the live production URL, the documentation, and the handover manifest.Deploy to your cloud account, transfer the repository to your organisation, clear studio secrets, and deliver the runbook.Handover verifiedComplete · next brief ready

The next move is yours

Send the idea. Sleep. Wake up to shipped software.

One active app per client. A named engineer. A written scope. A clock you can audit. Code and cloud ownership transferred at handover.